Structured Cabling & Fibre
The layer everything else stands on.
You only see cabling when it goes wrong. Done right, it disappears for 15+ years and absorbs every upgrade you throw at it. Done badly, you're paying for it again every two years.
What usually goes wrong
- Problem 1
Cables that nobody can trace
A failed switch port turns into a half-day hunt because nothing is labelled, nothing is documented, and the previous installer left.
- Problem 2
Network speed capped by old copper
Cat-5e installed a decade ago throttles modern Wi-Fi 6E and PoE++. You bought new gear, but inherited yesterday’s bottleneck.
- Problem 3
Recurring rework every refit
Every renovation rewires from scratch because the original was thrown together; capex stacks up year after year.
What we deliver
Pick the ones you need, or let us recommend the right mix.
Cat-6A copper backbone
10GBASE-T to every desk, certified to TIA-568. Ready for Wi-Fi 7, PoE++, and IP cameras on a single architecture.
OM4 / OS2 fibre risers
100G-ready vertical backbone using MPO trunks, splice boxes, and properly grounded enclosures.
Patch panel & labelling discipline
Every drop labelled at both ends, every patch panel mapped, every change logged. Your IT team finds the right cable in 30 seconds.
IP telephony & SIP
Voice rides the same backbone with QoS. Sales floors stop sounding like wind tunnels.
Cable tray & containment
Built to code, designed for the next contractor. Additions and changes do not require a forklift upgrade.
Full TIA-568 certification
Every link tested with calibrated equipment; pass/fail reports archived for the lifetime of the install.
Specification
- 15-year design horizon
- We engineer for the gear arriving in 2030, not the gear shipping today.
- Documentation pack
- Floor plans, patch schedules, certification reports. Handed over digitally, kept current.
- Salt-air & industrial ratings
- Specialist cable for piers, plant floors, and outdoor installs that must survive years of abuse.
- Fibre splice & termination
- Carrier-grade splice work, OTDR-tested, documented to the exact splice loss per joint.
Platforms we deploy
- CommScope
- Corning
- Panduit
- Yealink
- Cisco
- Belden
70 projects in this capability
70 projects
- 2026-09city'super · RetailCore switch configuration support for city'super
- 2026-08H.K.S.K.H. Lady MacLehose Centre · NGO2.5G access switching upgrade
- 2025-1015 Sports · RetailCisco switch configuration review
- 2025-10Hong Kong Sports Institute · OtherSwitch configuration and site deployment
- 2025-07McDonald's Hong Kong · RetailNetwork topology review
- 2025-06Mainland Headwear · ManufacturingOffice cabling design
- 2025-03Hong Kong Airlines · LogisticsNetwork switching refresh proposal
- 2025-02Regina Miracle International · ManufacturingOffice-to-DC network troubleshooting
- 2025-01Wai Kiu College · EducationSchool network troubleshooting
- 2025-01Regina Miracle International · ManufacturingCore router VRRP-to-stack migration
- 2024-12C.C.C. Rotary Secondary School · EducationCampus switch replacement and ONU migration
- 2024-10Kan Hing Plastic Factory · ManufacturingFactory network support
Questions
Should we install Cat-6A or Cat-6?
Cat-6A is now the practical floor for new installs. Full 10G to 100m, properly handles PoE++ heat. Cat-6 is acceptable only on tight refurbishments where 1G is the ceiling.
Do we need fibre or just copper?
Fibre belongs between floors and to the server room. Copper handles the last 100m to the user. Most builds are both.
Can you re-cable while we operate?
Yes. We plan cutovers around your operating hours, or run the new cable in parallel and migrate port-by-port.
Pairs well with
- NetworkWi-Fi & Wireless NetworksWi-Fi that holds up when it matters most.Open
- Data CenterServer Room & On-Prem InfrastructureWhere your business actually runs.Open
- Smart & SupportIoT & Smart BuildingBuildings that pay attention.Open
- Smart & SupportManaged IT & SupportThe IT department that picks up the phone.Open
Common inBanking & Financial ServicesGovernment & Public SectorSchools & Higher EducationHealthcare & Clinics
Add Network to your setup.
It is already ticked below. Add anything else you need, then send it over.